top of page
mangnolia_logo - Edited.png

    GOLD PROGRAM   

 POOL OPENING 

  • Remove pool cover, clean cover, fold and store with customer 

​

  • Power wash 3ft of deck around pool perimeter removing winter stains 

​

  • Install pool jets, baskets, railings, ladders, lights and diving board

​

  • Assemble pool equipment, install plugs, gauges, turbo cell, and miscellaneous fittings

​

  • Start pool filling and notify customer

​​

  • Initial chemical disinfection treatment with liquid chlorine shock and algaecide

​

  • Start pool filtration system, auto cleaner and any chemical automation equipment

  • Vacuum pool using a leaf trap, brush pool

​

  • interior surface, skim surface and empty baskets, clean filter if required 

​

  • Test pool chemistry and balance pool water as required 

​

  • Chemicals Extra

​

  • Leave a detailed written report

 MAINTENANCE 

  • Clean waterline around pool and brush pool surface 

​

  • Skim pool surface 

​

  • Vacuum pool using a leaf trap 

​

  • Clean skimmer baskets and pump baskets

​​​

  • Backwash filter or clean cartridges when required 

​

  • Test pool water for chlorine, bromine, ph, alkalinity, calcium, stabilizer and salinity levels 

​

  • Balance pool chemistry, empty auto cleaner basket, check equipment 

​

  • Chemicals Extra

​

  • Leave a detailed written report 

  POOL CLOSING   

  • Vacuum and brush pool interior 

​

  • Drain pool water to proper winterization level 

​

  • Blow all water out of plumbing lines and add antifreeze where required 

​

  • Add appropriate chemicals to balance pool water for the winter 

​

​​

  • Shut off electrical and gas services to the pool equipment 

​

  • Drain and winterize all pool mechanical equipment 

​

  • Install winter pool cover and store away pool equipment 

​

  • Chemicals Extra

​

  • Leave a detailed written report 

bottom of page