

GOLD PROGRAM
POOL OPENING
-
Remove pool cover, clean cover, fold and store with customer
-
Power wash 3ft of deck around pool perimeter removing winter stains
-
Install pool jets, baskets, railings, ladders, lights and diving board
-
Assemble pool equipment, install plugs, gauges, turbo cell, and miscellaneous fittings
-
Start pool filling and notify customer
-
Initial chemical disinfection treatment with liquid chlorine shock and algaecide
-
Start pool filtration system, auto cleaner and any chemical automation equipment
-
Vacuum pool using a leaf trap, brush pool
-
interior surface, skim surface and empty baskets, clean filter if required
-
Test pool chemistry and balance pool water as required
-
Chemicals Extra
-
Leave a detailed written report
MAINTENANCE
-
Clean waterline around pool and brush pool surface
-
Skim pool surface
-
Vacuum pool using a leaf trap
-
Clean skimmer baskets and pump baskets
-
Backwash filter or clean cartridges when required
-
Test pool water for chlorine, bromine, ph, alkalinity, calcium, stabilizer and salinity levels
-
Balance pool chemistry, empty auto cleaner basket, check equipment
-
Chemicals Extra
-
Leave a detailed written report
POOL CLOSING
-
Vacuum and brush pool interior
-
Drain pool water to proper winterization level
-
Blow all water out of plumbing lines and add antifreeze where required
-
Add appropriate chemicals to balance pool water for the winter
-
Shut off electrical and gas services to the pool equipment
-
Drain and winterize all pool mechanical equipment
-
Install winter pool cover and store away pool equipment
-
Chemicals Extra
-
Leave a detailed written report
